Beginning a kitchen remodel can be a daunting experience. Never really clear what’s going on or how long things should take may be common at other home improvement companies, but not at Preferred Home Builders. Outlined in this blog is how long as well as what goes in to the average kitchen remodel; of course depending on size of the kitchen and type of amenities, the time may vary. However, this will be a look at the average times.

Everything begins with the demolition of the previous kitchen. After everything has been safely removed and disposed of, framing of the new kitchen as well as our electrical and plumbing will be installed. After the kitchen has passed a rough inspection, a week has gone by and the next step begins.

Beginning on the second week of the project, the kitchen begins to take shape. Drywall is installed, sanded, and painted. Due to the high quality nature of our work, this process will bring us to the end of the second week of work. After all of this has been completed, the third week is ready to begin.

After everything has been properly cleaned and safely removed from the previous week’s work, the cabinets are ready to be installed and the countertop is measured and cut. As well as that, the kitchen flooring is installed. The kitchen finally begins to take shape.

On the fourth week, the countertop is measured, cut, and installed along with the customer’s choice of backsplash and moldings. Once the final appliances like dishwashers, sinks, and refrigerators are installed, the kitchen is ready for final inspection. After inspections are completed, the kitchen is ready to be enjoyed!